Waiting weeks—or even months—for fire safety plan approval can delay inspections, occupancy permits, and business openings. In British Columbia, approval delays are rarely random. They usually happen because of missing details, formatting issues, or gaps in fire code compliance.
Fire safety plan approvals across British Columbia may vary by municipality, including cities such as Vancouver, Burnaby, and Surrey, depending on local fire department review processes.
The good news? If you understand what fire departments and fire marshals look for during review, you can significantly reduce approval time and avoid repeated revisions.
This guide focuses on the approval process.If you’re new to the topic, start with our guide to fire safety plans for commercial buildings.
Many building owners assume approval delays are outside their control. In reality, most slowdowns happen during the fire safety plan review stage due to preventable issues.
Incomplete fire safety plan documentation
Incorrect or inconsistent fire safety plan format
Missing site-specific emergency procedures
Outdated or inaccurate building details
Failure to meet current building fire safety requirements
Each revision resets the review process, often pushing approval timelines back by weeks.
A detailed fire safety plan checklist ensures nothing critical is missed before submission.
Fire departments typically expect to see:
Emergency evacuation procedures
Descriptions of installed fire protection systems
Clearly defined staff roles and responsibilities
Floor plans showing exits and equipment
Procedures for fire drills and training
If even one item is missing or unclear, your submission may be rejected or returned for correction.
Even accurate information can be delayed if it’s presented poorly. Fire departments prefer a standardized fire safety plan format that is easy to review and verify.
A clean, organized fire safety plan:
Reduces review time
Minimizes clarification requests
Helps inspectors confirm fire code compliance faster
Using a consistent, professional format ensures your submission meets local review expectations and avoids unnecessary back-and-forth.
Trying to “fix” compliance issues after submission is one of the most common reasons fire safety plans are rejected.
Your plan must accurately reflect:
Current BC Fire Code standards
The actual building layout and occupancy
Installed fire alarm and suppression systems
When compliance is built into the plan from the beginning, approvals move faster and inspections run more smoothly.
Approval timelines vary depending on building size, complexity, and submission quality. In general:
Simple buildings: 2–4 weeks
Complex commercial buildings: 4–8+ weeks
Incomplete or poorly prepared plans can easily double these timelines. A well-prepared submission significantly reduces approval delays.
If time constraints or repeated revisions are a concern, working with an experienced fire safety plan consultant can help. Professionals understand:
The full fire department review process
Common issues that trigger rejection
How to avoid repeated revisions and approval delays
Approval delays often lead to additional rework. For a detailed breakdown of related pricing considerations, see our guide on fire safety plan cost in BC.
Getting your BC fire safety plan approved faster isn’t about shortcuts—it’s about preparation. By using a complete checklist, following the correct format, and designing for fire code compliance from the start, you can avoid rejection and shorten approval timelines significantly.
If you need expert support to reduce revisions and move confidently through the approval process, Otis Fire is here to help. Contact our team to have your fire safety plan reviewed, updated, or prepared correctly so you can open your building safely and on time.
Copyright © 2025 | Otis Fire All rights reserved